Qualit center

1.      Requirement traceability in QC traces
  •  a) Requirements
  •  b) All phases
  •  c) Defects
  •  d) None of the above
2.      Risk Analysis is done considering the parameters:
  •  a) Business Criticality
  •  b) Failure Probability
  •  c) Both A & B 
  •  d) None of the above
3.      A requirement can be associated with multiple defects
  •  a) True
  •  b) FALSE
4.      Defects logged during a manual test run are automatically associated with that specific test run
  •  a) True
  •  b) FALSE
5.      If the defect-test instance relationship is removed, the defect-test relationship still exists
  •  a) True
  •  b) FALSE
6.      Advantages of Test requirements:
  •  a) Aids development and testing
  •  b) Helps prevent scope creep
  •  c) Sets clear expectation between teams
  •  d) All of the above
7.      How many default test requirement types are there in QC?
  • a) 4
  • b) 6
  • c) 8
  • d) 10
8.      A group requirement groups related requirement
  • a) True
  • b) FALSE
9.      A system behavioral requirement that describes the functional aspects of an application is of requirement type:
  •  a) Folder
  •  b) Functional
  •  c) Group
  •  d) Testing
10.   A useful test requirement is always:
  • a) Unique
  • b) Precise
  • c) Bounded & Testable
  • d) All of the above
11.   A requirement type in QC is defined based on the context of the requirement
  • a) True
  • b) FALSE
12.   Requirement tree view has both parent and child requirement
  • a) True
  • b) FALSE
13.   Requirement tree has how many buttons?
  • a) 2
  • b) 3
  • c) 4
  • d) 5
14.   In "New Requirement" tab, which fields are mandatory
  • a) Name
  • b) Author
  • c) Priority
  • d) Target Cycle
15.   Set Filter/Sort in requirements module
  • a) Displays, hides modules
  • b) Filters requirements using their attributes
  • c) Refreshes the screen
  • d) Searches for entries in requirement fields
16.   A specific requirement in QC can be viewed in detail by using
  • a) Detail View
  • b) Grid View
  • c) Table View
  • d) None of the above
17.   The comment tab in Requirement module is used to:
  • a) Add views of different users when they login
  • b) Add detail description
  • c) Upload the requirement document
  • d) See all the requirements stored in QC
18.   Multiple requirements can be viewed in QC using:
  • a) Detail View
  • b) Grid View
  • c) Tree View
  • d) Both B & C
19.   Editing multiple requirements option is available in
  • a) Detail View
  • b) Grid View
  • c) Tree View
  • d) None of the above
20.   Assigning a requirement to a release creates a one-to-one relationship between a requirement and a release
  • a) True
  • b) FALSE
21.   Assigning a requirement to a release enables you to track requirements coverage according to cycles
  • a) True
  • b) FALSE
22.   QC is a standalone application
  • a) TRUE
  • b) False
23.   QC manages the testing assets:
  • a) Requirements
  • b) Test Cases
  • c) Defects
  • d) All of the above
24.   How many modules are there in QC?
  • a) 3
  • b) 5
  • c) 7
  • d) 10
25.   We can log new defects by
  • a) Defect Module
  • b) Using Tools Menu
  • c) Test Lab Module
  • d) All of the above
26.   Which tool is used to generate comprehensive project documentation that consists of the requirements, test plan, test list, test execution, and defect tracking data of your project
  • a) Project Customization
  • b) Document Generator
  • c) Excel Report Generator
  • d) MSQuery
27.   To generate a excel report:
  • a) Add a report to the Excel reports tree
  • b) Configure the report settings and define an SQL query to extract data
  • c) Add parameters to the report. Create a post-processing script
  • d) All of the above
28.   Through excel report generator, users can only select data and cannot insert data in or delete data from the SQL tables
  • a) True
  • b) FALSE
29.   A test set is a group of tests designed to achieve specific testing goals
  • a) True
  • b) FALSE
30.   A test set can contain a combination of manual and automated tests
  • a) True
  • b) FALSE
31.   A test set folder can be directly assigned to a release
  • a) TRUE
  • b) False
32.   Setting a timer for test execution can be decided by
  • a) Execution Grid
  • b) Execution Flow
  • c) Test Set Properties
  • d) Linked Defects
33.   Quality Center enables you to create and execute test cases for various automated tools, such as QuickTest Professional and LoadRunner
  • a) True
  • b) FALSE
34.   To run a test concurrently on multiple remote hosts, add multiple instances of the test to your test set
  • a) True
  • b) FALSE
35.   How many ways are there to create a test plan tree?
  • a) 2
  • b) 3
  • c) 4
  • d) 5
36.   To convert a requirement to a test:
  • a) Select an automatic method for conversion
  • b) Make changes to the automatic conversion
  • c) Select the destination subject path for tests
  • d) All of the above
37.   A test in a test plan tree should be:
  • a) Accurate
  • b) Economical
  • c) Consistent
  • d) All of the above
38.   In QC, we can able to call one test from another test?
  • a) True
  • b) FALSE
39.   Test parameters defined in QC tests are used to provide different data each time when the test is executed
  • a) True
  • b) FALSE
40.   You can define links between requirements and tests from the Test Plan module or the Requirements module
  • a) True
  • b) FALSE
41.   Release can be called as
  • a) Versions
  • b) Modules
  • c) Cycles
  • d) None of the above
42.   A release can have strictly only one cycle
  • a) TRUE
  • b) False
43.   A release can have multiple cycles
  • a) True
  • b) FALSE
44.   A cycle in QC is
  • a) Testing cycle
  • b) Release
  • c) Version
  • d) None of the above
45.   Release tree will have the structure:
  • a) Folder -> Cycle -> Release
  • b) Release ->Cycle -> Folder
  • c) Folder -> Release -> Cycle
  • d) Cycle -> Release -> Folder
46.   Release tree will have the following buttons:
  • a) Folder button
  • b) Release button
  • c) Cycle button
  • d) All of the above

47.   2 cycles dates in the same release can overlap each other
  • a) True
  • b) FALSE

48.   File attachment attaches:
  • a) Spreadsheets
  • b) Documents
  • c) Reports
  • d) All of the above

49.   Snapshot attachment:
  • a) Saves in BMP format
  • b) Saves in JPEG format
  • c) Both A & B
  • d) Either A or B
50.   Risk is analysed considering both business criticality and failure probability of a typical requirement
            a) True
            b) FALSE

  
Answers
Ques No.
Correct Answers
1.    
A
2.    
C
3.    
A
4.    
A
5.    
A
6.    
D
7.    
B
8.    
A
9.    
B
10.  
D
11.  
A
12.  
A
13.  
B
14.  
A
15.  
B
16.  
A
17.  
A
18.  
D
19.  
B
20.  
A
21.  
A
22.  
B
23.  
D
24.  
C
25.  
D
26.  
B
27.  
D
28.  
A
29.  
A
30.  
A
31.  
B
32.  
B
33.  
A
34.  
A
35.  
A
36.  
D
37.  
D
38.  
A
39.  
A
40.  
A
41.  
A
42.  
B
43.  
A
44.  
A
45.  
C
46.  
D
47.  
A
48.  
D
49.  
B
50.
A